Responsibility:
Visual and technical check of RM at the entry for the physical and chemical test against the RMTC
Surveillance and Monitoring of the fabrication, welding, inspection & testing and NDT activities by verifying the parameter as per the approved internal or external MQP
Preparation and Verification of dimensional reports for the components in Fit-up, after fabrication, welding or painting
Interacting with all departments in each entity throughout the phases of the project to ensure that quality requirements are met
Coordination and maintaining 5S on the shop floor
Monitor, review and take action on the preparation and compiling of QC documents for final FTR and co-ordinate with Internal Quality Manager for the final approval