Responsibility:
€¢ Visual and technical check of RM at the entry for the physical and chemical test against the RMTC
€¢ Surveillance and Monitoring of the fabrication, welding, inspection & testing and NDT activities by verifying the parameter as per the approved internal or external MQP
€¢ Preparation and Verification of dimensional reports for the components in Fit-up, after fabrication, welding or painting
€¢ Interacting with all departments in each entity throughout the phases of the project to ensure that quality requirements are met
€¢ Coordination and maintaining 5S on the shop floor
€¢ Monitor, review and take action on the preparation and compiling of QC documents for final FTR and co-ordinate with Internal Quality Manager for the final approval