1. MANPOWER MANAGEMENT & MANPOWER COST (MAIN FOCUS)
• Decide the right number of workers needed for each machine and each line to meet the daily target - not more, not less.
• Reduce the number of workers used per shift wherever possible, without reducing production.
• Track manpower cost every day and compare it to production output - the goal is maximum output per worker, at the lowest manpower cost.
• Cut overtime hours by planning and managing manpower better.
• Work towards removing the night shift completely, by making day and evening shifts efficient enough to cover the full target.
• Train workers to handle more than one machine or job, so fewer workers can run more stations.
• Remove unnecessary manpower stages - any point in the process where extra workers are placed but not adding real value.
• Handle attendance, shift roster, and daily manpower deployment across the shop floor.
• Train supervisors and line in-charges to run their line independently, with the least number of workers, without dropping output or quality.
2. PRODUCTION PLANNING
• Make the daily, weekly, and monthly production plan for press shop, pipe bending, welding, and fabrication.
• Make sure material planning is done on time - no line should stop because material was not ready.
• Set the priority of jobs (which order to run) based on customer requirement and dispatch plan.
• Break the plan into hour-by-hour targets for each machine, not just a shift-end number.
3. LINE BALANCING & EFFICIENCY
• Balance manpower and machines on each line so that no worker or machine sits idle.
• Remove bottlenecks that slow down the full line.
• Find out why night shifts and low-efficiency shifts are happening, and fix the reason permanently.
4. PRODUCTION COST REDUCTION
• Reduce cost per part, with manpower cost as the main lever.
• Reduce scrap, rework, and rejection through better process discipline.
• Find and implement cost-saving ideas on the shop floor - consumables, power, tooling, changeover time.
5. DAILY REPORTING
• Give hourly production reports for every machine - output against target.
• Give daily downtime reports - which machine stopped, for how long, and why.
• Give breakdown reports - when it happened, when it was fixed, and the reason.
• Reports should be quick and clear, so problems are caught the same shift, not the next day.
6. KAIZEN (CONTINUOUS IMPROVEMENT)
• Run regular Kaizen activities on the floor to improve cycle time, layout, and material flow.
• Keep a simple running list of improvements raised and closed.
7. PROBLEM SOLVING
• Walk the shop floor daily to catch problems that reports may not show - idle time, small stoppages, wasted movement.
• Find the root cause of repeat problems (breakdowns, low-efficiency shifts, rejections) and fix them permanently, not temporarily.
• Inform the Plant Head about any issue that needs support beyond the shop floor.