Designation - Foreman
1 Work to be done as per drawing and quality to be maintained .
2 Column marking , Rangat ,Diagonal dimensions , Mortar thickness etc.
3 Line level of shuttering /Brick works/ Plaster/Plumb etc.
4 Deshuttering of material as per timeline.
5 Care of company material specially shuttering/tiles/steel/kheela lying at site
6 Before signing off check work is in line level /plumb by using tools like phanti/plumb/level tube/level pipe etc.
7 End of the day report of work done at site submit to execution engineer with labour deployment details
8 Next day planning + preparation of material as per instructions of execution engineer
9 Keeping a check on wastage of materials .