3

Site Engineer Job Vacancies in Alwar

Civil Site Engineer

Balaji Shades

  • 1 - 7 yrs
  • 2.5 Lac/Yr
  • Alwar
Civil Structural Designing Site Supervision Site Execution Building Construction Manpower Planning Shuttering Project Planning
Need a person urgently for projects
View all details

Civil Engineer

Perfect Engineers & Resources Private Limited

  • 2 - 8 yrs
  • 5.0 Lac/Yr
  • Neemrana Alwar
Site Execution
Responsibilities in PEB:Design and Planning:Developing detailed plans, specifications, and drawings for PEB structures, considering factors like load bearing, stability, and structural integrity. Construction Management:Overseeing the construction process, including site preparation, fabrication, erection, and finishing of PEB structures. Quality Control:Ensuring that all aspects of the PEB construction meet the required quality standards and safety regulations. Coordination and Communication:Working with architects, contractors, and other stakeholders to ensure smooth project execution. Material Selection:Selecting appropriate materials for PEB structures, considering factors like durability, cost, and availability. Budget Management:Managing the project budget and ensuring that construction costs are within the allocated limits.
View all details

HVAC Engineer

CE Comfort Engineers Pvt. Ltd.

Heat Load Calculation REVIT MEP Mechanical Engineer Mechanical Site Engineer HVAC Site Engineer HVAC Supervisor HVAC Maintenance Manager HVAC
Lets take a look at some of the most important job responsibilities of an HVAC engineer:Ensure that the Inspection department approves fittings, ducts, water pipes, and other accessories before the installation begins.Deliver all tools required for the fitting including power tools, hand tools, scaffolding, and ladder on time and in the exact numbers as mentioned in the list.Prepare, apply, and get approval for the HVAC shop drawings, work method statement, MEP-coordination drawing, and project specification from the head engineer.Coordinate installation schedule with team members and other departments working on the project.Monitor site activities and make sure all rules and regulations are followed. Making reports on daily progress made at work and ensuring it reaches the superiors.Ensure safe construction of heating, ventilation, and air conditioning maintenance according to rules and regulations set by the safety policy manual by the company. They will have to ensure the protection and safety equipment is 100 per cent tried and tested for safe use.Arrange labor and other professionals including pipe fitter, duct fitter and assistant duct fitter. They also act as a supervisor for the installation and maintenance project.Additional responsibilities include having to arrange for the safety gear and equipment they need to do their work.Documentation of the Conduct Testing inspection process for a variety of tasks including the light test for ducts, underground chilled water piping system, and hydro test.Attending weekly and monthly meetings held by the project manager and QC supervisor to talk about the project updates and completion.Assisting the commission team during the testing, balancing, and adjusting phases of air and hydronic fitting.
View all details