Should design HVAC system on the base of site requirements Should prepare Room data sheet and Basis of design Follow up with the client/consultant for the earliest approval of drawings. Prepare GA drawings of AHU, electrical panel, HEPA box, Return air riser, CHW/HOT water/Steam/Refrigerant manifold piping drg