Three Phase House Wiring, Installation Electrical Smart Meter, Electrical Wiring,
1. Site survey before the installation to determine the best locations for meters and ensure that all necessary equipment and materials are available.
2. Provide the site survey reports with all requirements to their team leader’s.
3. Collect the site information, Job card, Meters and all other equipment required for installation.
4. Install the meters and devices at site and complete all wire dressing in an appropriate way.
5. Live the meters by coordinating with their team leader’s.
6. Handover the Job card and pics of installation to the team leaders.
7. Resolved the complaints forwarded by team leaders with job cards and before leaving the site, must ensure that customers are satisfied with the solution.
8. Prepare their Conveyance sheet before 5th of every month and submit it to the team leader.