1. Technicians will be required to carry out assembly and integrationas per engineering drawings in our Technology Center in Pune.2. The same Assembly and integration will also need to be done atSite across India (typically 2-6 days).3. Technicians will be responsible for repairs and maintenancejob of various engineering goods.(Adequate Training on goodswill be provided)4. Majority of assembly involves high pressure tubing andfittings .Major components involves pressure and flow controlcomponents like Pressure regulators , Filters, Tubing, Valvesetc.5. Repairing of products will again be mainly pressure and flowcontrol products but also other products from time to time