1. Steel Erection & Drawing Assembly
- Drawing Reading: Study structural steel drawings, layout details, and levels to plan the daily installation
sequence.
-Frame Assembly: Physically erect, bolt, and secure the metal framework, including columns, beams,
ladders, and scaffolding.
Manual Connecting: Carry out structural bolting using podger spanners and impact wrenches, or complete
basic field welding.
- Alignment Checks: Check that all columns and beams are perfectly straight and level using a spirit level and
plumb-rule.
- Direct Lifting: Signal crane or HIAB operators to safely lift, move, and position heavy girders into place.
2. Parking Decks & External Facades
- Metal Deck Installation: Lay down and secure interlocking metal flooring deck sheets specifically made for
modular car parks.
- Facade Fitting: Fix vertical and horizontal exterior aesthetic facade panels to the outside of the car park.
- Height Work: Safely operate from elevated scissor lifts or boom lifts (MEWPs) using full safety harnesses.
3. Concrete & Civil Integration
Steel Mesh Fixing: Cut, lay down, and tie steel reinforcement wire mesh into position over the metal decking
before concrete arrives.
Concrete Pouring: Help receive, rake, vibrate, and level wet concrete directly onto the car park deck
surface.
- Drainage Slopes: Make sure the finished concrete surface is flat but sloped slightly so rainwater drains
away correctly.